Bathroom renovationStarting March 4th, and Finally finishing on the
29th we renovated our bathroom.
most of it was preparation work until the 16th & 17th when the Tub/Show upgrade was put in by Bath Fitter so here is the before (pictures taken sometime after we moved in)
We took down the curtains, removed the wallpaper (which was already coming off on it's own to some extent), removed the ugly pink plastic tiles, removed the built-in medicine cabinet (after the estimate from Bath Fitter, they knew that the medicine cabinet would be in the way) Bath Fitter overlay an acrylic surround and tub, without having to tear everything out, so it's a fairly quick install. The did replace parts of the wall that had been water damaged, and the hot & cold water pipes were also replaced when it was found they were galvanized rather then copper. Once Bath Fitter finished, we finished the putty work to smooth the walls, primed & painted, replaced the light, put in a new medicine cabinet/mirror new "over john" storage cabinet, and new towel & toilet paper holders. Click here or on pictures below to go to the fully picture gallery showing the reno:
Posted: Sat - April 1, 2006 at 02:34 PM |
Quick Links
Current Weather
Links to other websites
My Main Website (Not working yet)
My Calendar (Work and other Events) The DVD collection My Movie Wish List (Movies I don't have yet) Movie Reviews by Brian
Guin's Blog Archives
Categories
Calendar
XML/RSS Feed
Comments powered by
Statistics
Total entries in this blog:
Total entries in this category: Published On: Jul 28, 2006 02:36 PM |
||||||||||||||